Tertiary Hospital Operating Room Purification System Renovation Project
Healthcare
Beijing
2025

Grade 3A Hospital Operating Room Purification System Renovation Project

Customer Name
A Grade 3A Hospital
Project Area
12 operating rooms
Cleanliness Class
Class 100 laminar flow
Project Location
Beijing

Project Challenges

The hospital's existing operating room purification system has been in operation for over 10 years. Equipment aging has resulted in non-compliant cleanliness levels and excessive noise (up to 70 dB). The renovation must be completed without disrupting scheduled surgeries, while ensuring that select operating rooms remain available for emergency use during the upgrade.

Solutions

Adopt a phased construction approach, starting with the temporary transition area. The new system features Class 100 laminar airflow ceilings, low-noise fan units (operating noise ≤ 45dB), and an intelligent control system. Construction will be scheduled during nights and weekends to minimize disruption to hospital operations. Each operating room is equipped with an independent control unit supporting multiple modes: pre-operative self-cleaning, constant operation during surgery, and post-operative purge.

Project Outcomes

Completed renovation of 12 operating rooms within 30 days, reducing noise to below 45dB and achieving Class 100 cleanliness standards, earning hospital approval. Post-renovation, infection rates in operating rooms dropped by 60%, significantly improving the work environment for medical staff.

Project Site

Project Site 1Project Site 2Project Site 3

Use Product

  • Class 100 laminar flow ceiling
  • High-efficiency Filter H4
  • Silent Fan Coil Unit
  • Smart Control Panel
  • Medical Airtight Door